 |
DESCRIPTION: Vacuum blade lifter. 8 vacuum pad electric powered blade lifter. Equalizer system to insure even load on all pads.
WLL: 10 ton.
PROJECTNR.: LT811
APPROVED FOR: European Union (EU).
.
|
 |
DESCRIPTION: 36 meter Spreader beam. Designed for erecting tower sections. The spreader beam can lift in 3 different configurations. Changed from one lifting configuration to another within 5 minutes.
WLL: 61 ton.
PROJECTNR.: LT806
APPROVED FOR: European Union (EU), USA.
.
|
 |
DESCRIPTION: Lifting hook for tower section. Multiple flange diameters and thicknesses. Rubber and nylon pads.
WLL: 50 ton.
PROJECTNR.: LT576-1
APPROVED FOR: European Union (EU), USA.
.
|
 |
DESCRIPTION: The Blade Dragon is a remote controlled yoke that handles blades in wind speeds up to 12 m/s for installation on the hub in all positions.
WLL: 20 ton.
PROJECTNR.: LT575
APPROVED FOR: European Union (EU).
.
|
 |
DESCRIPTION: Lifting yoke blade. A lifting yoke for handling 61.5m blades during assembling and disassembling of blades.
WLL: 22 ton.
PROJECTNR.: LT485
APPROVED FOR: European Union (EU).
.
|
 |
DESCRIPTION: Adjustable lifting yoke. Part of Liftra's broad range of lifting yokes.
WLL: 20 t.
PROJECTNR.: LT504
APPROVED FOR: European Union (EU).
.
|
 |
DESCRIPTION: Adjustment yoke for drive train. A lifting yoke for lifting and adjusting drive train for wind turbine.
WLL: 77 ton.
PROJECTNR.: LT481
APPROVED FOR: European Union (EU).
.
|
 |
DESCRIPTION: Bridge yoke. A bridge yoke that is designed for continuous rotation of a load.
WLL: 91 ton.
PROJECTNR.: LT409
APPROVED FOR: European Union (EU).
.
|
 |
DESCRIPTION: Lifting bracket for the bottom of a tower. Used when turning the tower from horizontal to vertical.
WLL: 30 ton.
PROJECTNR.: LT395
APPROVED FOR: European Union (EU).
.
|
 |
DESCRIPTION: Hub yoke for NM2000/72. The yoke is used when a complete hub is mounted/dismounted to the nacelle. The hub tilts 6º during lift to ensure the top flanges of the hub and nacelle will connect smoothly.
WLL: 45 ton.
PROJECTNR.: LT382
APPROVED FOR: European Union (EU).
.
|
 |
DESCRIPTION: Transport frame 5MW tower sections. Used during transport on both ship and lorry. Furthermore the frame system is used as lifting equipment during erection on site of the 5MW tower.
WLL: 220 ton, 140 ton (when used during transport with transport adapter mounted).
PROJECTNR.: LT325
APPROVED FOR: European Union (EU), Offshore (IMO).
.
|
 |
DESCRIPTION: Vacuum yoke. Designed to lift and move glass-fiber section for wind turbine nacelle sections of different shapes and sizes. The yoke is flexible and can be turned and angled in many directions.
WLL: 360 kg/1 ton.
PROJECTNR.: LT233
APPROVED FOR: European Union (EU).
.
|
 |
DESCRIPTION: Hook with swivel bolt. A swivel hook for transportation of tower sections.
WLL: 45 ton.
PROJECTNR.: LT197
APPROVED FOR: European Union (EU).
.
|
 |
DESCRIPTION: Lifting yoke for 5 MW hub.
WLL: 130 ton.
PROJECTNR.: LT192
APPROVED FOR: European Union (EU).
.
|
 |
DESCRIPTION: Hook for flange. The hook is designed to fit the flange of a tower. The hook has an extra support beam to decrease the surface pressure on the flange when lifting.
WLL: 50 ton.
PROJECTNR.: LT135
APPROVED FOR: European Union (EU).
.
|
 |
DESCRIPTION: Forklift hook. Crane hook for use during transport of towers sections.
WLL: 34 ton.
PROJECTNR.: LT091
APPROVED FOR: European Union (EU).
.
|
 |
DESCRIPTION: Lifting yoke for transmission NM1500-NM2750.
WLL: 50 ton.
PROJECTNR.: LT011
APPROVED FOR: European Union (EU).
.
|